Testing & Certification
Fleet Pitot-Static & Transponder Certification
On-site testing completed across a multi-aircraft fleet without moving any airframe.

The Work
What was involved.
Rather than cycling each aircraft through a shop, testing was carried out on site across the fleet on a coordinated schedule. Pitot-static and transponder testing was completed against calibrated references, discrepancies investigated as they were found, and results documented for each aircraft's records.
Result
On-site testing completed across a multi-aircraft fleet without moving any airframe.
Capability
Testing & CertificationPitot-static and transponder testing, system verification and inspection.
Process
How this kind of work runs
Every job follows the same four steps, so you always know which stage yours is at.
- 01
Scope & scheduling
Confirm which tests are required, on which aircraft, and where the work will happen.
- 02
Setup & connection
Test equipment connected to the aircraft under the correct procedure and precautions.
- 03
Test & measure
Testing carried out across the required range, with any discrepancy investigated.
- 04
Document & release
Results recorded, discrepancies reported, and paperwork completed for the aircraft records.
More Work
Other projects.
Different aircraft, different systems, same approach.
Next Step
Similar problem?
Or a stranger one?
Most of the work worth talking about started as something another shop had already looked at.